Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-seo-pack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kpaulicelli/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the disable-gutenberg domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kpaulicelli/public_html/wp-includes/functions.php on line 6121
Premier Mechanical Services Town of Brookhaven - Premier Mechanical

Town of Brookhaven Landfill Maintenance Facility

Premier Mechanical recently aided in the completion of a new maintenance facility for the Town of Brookhaven’s Landfill facility. This new high efficiency maintenance facility includes a condensing boiler and hot water plant with a complete radiant heating slab distribution system for optimal efficiency. The new office areas are served by cutting edge variable refrigerant flow systems with zone controls to provide maximum comfort and efficiency. The garage is equipped with a complete makeup air vehicle exhaust system to regulate CO levels and maintain a safe working environment for the town employees. To add to the landfill’s efficiency, we have installed a waste oil boiler plant to allow the town to utilize waste oils to provide supplemental heating for the facility.