Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-seo-pack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kpaulicelli/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the disable-gutenberg domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kpaulicelli/public_html/wp-includes/functions.php on line 6121
Premier Mechanical Services Town of Babylon - Premier Mechanical

Town of Babylon Animal Shelter

Premier participated in the recent construction of the Town of Babylon’s new 15,000 square foot animal shelter facility. This was a complete new HVAC system consists of high efficiency, gas fired rooftop units with energy recovery ventilators to ensure proper ventilation to eliminate odors and potential disease spread to healthy animals. This facility includes 12 separate zones for comfort control. The new animal shelter is equipped with animal operating room, dog kennels, cat condo area and bathing suites.