Deprecated: Optional parameter $i declared before required parameter $post_id is implicitly treated as a required parameter in /home/kpaulicelli/public_html/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 739

Deprecated: Optional parameter $i declared before required parameter $post_id is implicitly treated as a required parameter in /home/kpaulicelli/public_html/wp-content/plugins/acf-repeater/includes/5-7/acf-repeater-field.php on line 805
Premier Mechanical Services 24 Hour Fitness - Premier Mechanical

24 Hour Fitness Valley Stream NY

This project consisted of a new two level 35,000.00 square foot fitness center. The new Fitness center has interior lap pool, locker rooms, private spin rooms, administrative offices, health shopping area and spa. The new mechanical (HVAC) system includes 14 new high efficiency rooftop units, room exhaust systems, room purge system (for odor and humidity removal), direct digital controls with wireless/remote adjustment features and over 30 thousand pounds of heavy gauge sheet metal. The new pool and spa area was provided with a state of the art dehumidification system and aluminum ductwork distribution system as required for pool and spa areas.